Experience and knowledge, acquired through the years of work on interesting projects, we succeed in applying the design and integration of new solutions, improving the quality of our services, and thus gaining other satisfied customers in different parts of the world.

HIGHWAY & TUNNEL

TECHNOLOGIES

Tunnel Zheleznitsa

Bulgaria

Creating a complete tender documentation for technical solution for Zheleznitsa Tunnel

  • basic documentation analysis, complete system design based on valid EU norms

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

Zheleznitsa

start:

april 2020

completion:

may 2020

Central Kowloon Route

China

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

  • support wih cabinets specification, calculation of individual components and with redundant power supply solution

  • specification of CCTV solution via Video OA app

  • specification of event management solution via our EMM module (Event Management Module), simultaneous integration in GIS at the WinCC OA platform

  • support with document creation for the tender

Hong Kong

start:

september 2019

completion:

february 2020

Mina Tunnel

United Arab Emirates

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, design of the network and device connection to the central system, support with document creation for the tender

Abu Dabi

start:

october 2018

completion:

december 2018

Siemens AG (Intertraffic Amsterdam)

Germany

Preparation of the ITCC/Conduct+ Demo project of Siemens Munich ITS for Intertraffic Exhibition, Amsterdam

  • creating Demo Project using virtual computers, which represent PLC system (using Step7 TIA Professional v14) and SCADA system (using WinCC OA 3.14) with integrated simulator

Munich

start:

october 2017

completion:

march 2018

Liantang/Heung Yuen Wai Boundary Control Point Tunnel

China

Programming of modules for Central Control System of the highway tunnels

  • programming of modules EMM/GIS in WinCC OA 3.14

  • integration to the ITCC/Conduct+ system of the SIEMENS company

Hong Kong

start:

march 2016

completion:

july 2017

Liantang/Heung Yuen Wai Boundary Control Point

China

Consulting in the tendering process

  • consultancy in the field of information system technologies and tunnel safety control

  • creation of binding documentation

Hong Kong

start:

september 2015

completion:

february 2016

Gradiška - Banja Luka Highway tunnels

Bosnia and Herzegovina

Designing and programming of subsystems for tunnel ventilation and lightning

  • basic documentation analysis and solution design

  • realization of ITCC solution on SCADA level using WinCC OA 3.14

  • integration of PLC – ITCC – Conduct+  highway redundant solution

Gradiška – Banja Luka

start:

july 2019

completion:

april 2020

Kai Tak Tunnel

China

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

  • specification of the CCTV solution via Video OA app

  • specification of the event management solution via our EMM module (Event Management Module)

  • support with document creation for the tender

Hong Kong

start:

may 2019

completion:

november 2019

Cross-Harbour Tunnel

China

Modernization design of the control system

  • architecture design and RS components using PLC Simatic

  • network components design of redundant communication networks, including calculations of throughput, availability, and reliability of the networks

  • SIMATIC HMI panels design from KTP set for local control of tunnel and highway technologies

Hong Kong

start:

july 2018

completion:

august 2018

Qatar Education City Tunnel

Qatar

Automation system of tunnel fire ventilation with additional systems for traffic management

  • technology analysis and solution design covered by approved functional description of the system

  • PLC S7-400H / S7-1200 / WinCC OA / TP900 Comfort programming / PAC3200 configuration

  • network configuration using Scalance modules

  • communication with master OMCC SCADA system through CP343 using IEC 60870-5-104 protocol

  • communication with backup power supply system CBS (Central Battery System) using BacNet protocol

  • pre-FAT tests in our office, FAT tests in Leipzig at cabinets manufacturers’, commissioning in Qatar, SAT tests with the customer’s attendance

  • project management, creation of documentation for individual tests

Doha

start:

july 2016

completion:

august 2017

Highway D4 and Expressway R7

Slovakia

Consulting of the solution design and tendering process

  • consultancy in the field of highway information system technologies

  • solution design, creation of documentation

Bratislava

start:

august 2015

completion:

may 2016

Theatertunnel

Germany

Program adaptation for control and monitoring

  • S7-400

  • WinCC OA

Frankfurt

start:

august 2015

completion:

september 2015

Communication RTA Protocol

Australia

Communication protocol development for traffic LED signs used in Australian ITS projects

  • protocol analysis based on TSI-SP003 ver. 5.0 specification, solution design

  • communication protocol development using C#, compilation into dll

  • integration to the SCADA platform WinCC OA 3.16 using standard interface CSI

Sydney

start:

november 2019

completion:

february 2020

ITS World Congress Singapore

Singapore

Implementation of changes into the Demo Project for International Exhibition

  • creating Demo Project using virtual computers, which represent PLC system (using Step7 TIA Professional v14) a SCADA system (using WinCC OA 3.14) with integrated simulator

  • implementation of new features by creating Dashboard in the third virtual computer using WinCC OA 3.16

Singapore

start:

august 2019

completion:

september 2019

Tseung Kwan O – Lam Tin Tunnel

China

Consulting and helping with solution design and creation of documentation for tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

  • support with installation and optimalization of devices

  • support with quotation for tender process

Hong Kong

start:

january 2018

completion:

march 2018

Liantang/Heung Yuen Wai Boundary Control Point Tunnel

China

Consulting and solution design for highway and highway tunnels

  • consultancy in field of highway and tunnel information system technologies

  • designing the solution, creating the documentation with approval by the customer, presenting the solution to the customer in Hong Kong

  • creating the documentation for central control system testing as well as testing of individual subsystems

Hong Kong

start:

october 2016

completion:

july 2017

Qatar Education City Tunnel

Qatar

Consulting in the tendering process

  • consultancy in the field of information system technologies and tunnel safety control

Doha

start:

july 2015

completion:

march 2016

Sitina Tunnel

Slovakia

Conversion of SCADA system

  • conversion of the original SCADA system from PVSS (WinCC OA) into new Cimplicity 8.0 system

Bratislava

start:

july 2013

completion:

october 2013

 

šaľa | nitriansky kraj | slovensko

emst s.r.o. | passion for automation

© Copyright 2020

  • Facebook
  • LinkedIn