top of page
klienti, projekty, referencie, network

THE BETTER STARTS HERE

Experience and knowledge, acquired through the years of work on interesting projects, we succeed in applying the design and integration of new solutions, improving the quality of our services, and thus gaining other satisfied customers in different parts of the world.

HIGHWAY & TUNNEL

TECHNOLOGIES

DialTunTech

Projection/design of highway technology

  • creation of project documentation for the realization of the DIS construction (construction and technological part) - Phase Draft, Concent, Final document
icons_negative_international.png

Design of highway technology Section of D4 Highway

Skalka – Háje - Mirotice – Krašovice

Czech Republic

start:

june 2022

completion:

august 2023 (estimated)

Eurovia CZ

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system
  • support with document creation for the tender
icons_negative_international.png

Silvertown Tunnel

London

England

start:

june 2022

completion:

september 2022

Yunex Traffic Munich

Creation of technical documents, programming of the central SCADA control system, programming of the redundant PLC and peripherals of the Zheleznitsa tunnel

  • analysis of documents for construction and implementation of technologies in the tunnel
  • development of Technical Requirements for the SCADA system
  • consultation of interfaces of individual subsystems, design of tunnel control system components, communication network and connection of devices to the central system,
  • programming of the redundant central SCADA control system WinCC OA 3.16
  • programming of redundant PLC S7-400H / S7-1200 and peripherals
  • integration of PLC - ITCC - Conduct+ tunnel solution into the redundant central system
  • creation of communication interfaces with subsystems
  • realization of pre-FAT tests in the company premises
  • implementation of FAT tests at the manufacturer of technological switchboards
  • commisioning and SIT support
  • SAT tests with customer participation
icons_negative_international.png

Tunel Zheleznitsa

Zheleznitsa

Bulgaria

start:

july 2021

completion:

may 2023 (estimated)

Yunex Traffic Sofia

Cooperation with SIEMENS’ international team on new engineering platform for highway and tunnel systems named VARIA

  • analysis and creation of database system for OS Win/Unix

  • interface between WinCC OA 3.16 and database system

  • support with creating communication protocols

icons_negative_international.png

VARIA System

Munich

Germany

start:

march 2020

completion:

december 2023 (estimated)

Yunex Traffic Munich

Designing and programming of subsystems for tunnel ventilation and lightning

  • basic documentation analysis and solution design

  • realization of ITCC solution on SCADA level using WinCC OA 3.14

  • integration of PLC – ITCC – Conduct+  highway redundant solution

icons_negative_international.png

Gradiška - Banja Luka Highway tunnels

Gradiška – Banja Luka

Bosnia and Herzegovina

start:

july 2019

completion:

april 2020

Siemens ITS Beograd

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

  • specification of the CCTV solution via Video OA app

  • specification of the event management solution via our EMM module (Event Management Module)

  • support with document creation for the tender

icons_negative_international.png

Kai Tak Tunnel

Hong Kong

China

start:

may 2019

completion:

november 2019

Siemens ITS Hong Kong

Modernization design of the control system

  • architecture design and RS components using PLC Simatic

  • network components design of redundant communication networks, including calculations of throughput, availability, and reliability of the networks

  • SIMATIC HMI panels design from KTP set for local control of tunnel and highway technologies

icons_negative_international.png

Cross-Harbour Tunnel

Hong Kong

China

start:

july 2018

completion:

august 2018

Siemens ITS Hong Kong

Automation system of tunnel fire ventilation with additional systems for traffic management

  • technology analysis and solution design covered by approved functional description of the system

  • PLC S7-400H / S7-1200 / WinCC OA / TP900 Comfort programming / PAC3200 configuration

  • network configuration using Scalance modules

  • communication with master OMCC SCADA system through CP343 using IEC 60870-5-104 protocol

  • communication with backup power supply system CBS (Central Battery System) using BacNet protocol

  • pre-FAT tests in our office, FAT tests in Leipzig at cabinets manufacturers’, commissioning in Qatar, SAT tests with the customer’s attendance

  • project management, creation of documentation for individual tests

icons_negative_international.png

Qatar Education City Tunnel

Doha

Qatar

start:

july 2016

completion:

august 2017

Siemens ITS Munich

Consulting of the solution design and tendering process

  • consultancy in the field of highway information system technologies

  • solution design, creation of documentation

icons_negative_international.png

Highway D4 and Expressway R7

Bratislava

Slovakia

start:

august 2015

completion:

may 2016

Granvia a.s.

Program adaptation for control and monitoring

  • S7-400

  • WinCC OA

icons_negative_international.png

Theater Tunnel

Frankfurt

Germany

start:

august 2015

completion:

september 2015

Siemens ITS Munich

Specialist for highway technology

  • creation of Technical requirements and characteristics of highway technology
  • creation of Technical requirements for SCADA system
  • communication and clarification of equipment parameters and operation with the Concessionaire, Operator, Ministry of Transport, NDIC
  • processing of documents for requests to change the assignment on the side of the Contracting Authority / contractor
  • management and control of the activities of designers, coordination with projects of other professions, commenting
  • consultations in the construction process of DIS
icons_negative_international.png

Specialist for highway technology Section of D4 Highway

Skalka – Háje - Mirotice – Krašovice

Czech Republic

start:

april 2021

completion:

december 2024 (estimated)

Eurovia CZ

Modernization design of the central control system and local control systems for 54 tunnels in the Wallonia region

  • design of the architecture and components of the local control system using PLC Simatic in the tender phase
  • design of SIMATIC IPC panels and IoT devices for local control technologies in the tender phase
  • design of the architecture and components of the central control SCADA system using WinCC OA 3.18 and Varia in the tender phase
  • analysis of existing local control systems and development of documents for replacement of local control systems
  • creation of Technical Requirements for the central control SCADA system
  • development of technical requirements and design of components for the local tunnel control system
  • programming of redundant distributed central control SCADA system WinCC OA 3.18 and Varia
  • programming of local control systems S7-1500 and local distributed control systems WinCC OA 3.18 and Varia
icons_negative_international.png

Wallonia Tunnels

Brussels

Belgium

start:

march 2022

completion:

2024 (estimated)

Yunex Traffic Munich/Yunex Traffic Belgium

Implementation of modifications into a Demonstration project for International exhibitions and Potential customers

  • creating a data space in the Amazon AWS Cloud environment
  • migration of virtual servers to Amazon AWS Cloud
  • creation of a remote management console to control the servers
  • creation of rules for server scaling and security
  • implementation of new functionalities of the demonstration project
icons_negative_international.png

ITCC Demonstrator upgrades

Munich

Germany

start:

january 2020

completion:

september 2021

Siemens ITS Munich

Creating a complete tender documentation for technical solution for D4 Highway

  • complete information system design based on concession contract and legal norms

  • individual technological subsystems design, bill of quantities, calculation

  • central system design, bill of quantities, calculation

  • technical proposal for administration and maintenance of the highway information system

icons_negative_international.png

Section of D4 Highway

Skalka – Háje - Mirotice – Krašovice

Czechia

start:

november 2019

completion:

august 2020

Eurovia CZ

Communication protocol development for traffic LED signs used in Australian ITS projects

  • protocol analysis based on TSI-SP003 ver. 5.0 specification, solution design

  • communication protocol development using C#, compilation into dll

  • integration to the SCADA platform WinCC OA 3.16 using standard interface CSI

icons_negative_international.png

Communication RTA Protocol

Sydney

Australia

start:

november 2019

completion:

february 2020

Siemens ITS Munich

Implementation of changes into the Demo Project for International Exhibition

  • creating Demo Project using virtual computers, which represent PLC system (using Step7 TIA Professional v14) a SCADA system (using WinCC OA 3.14) with integrated simulator

  • implementation of new features by creating Dashboard in the third virtual computer using WinCC OA 3.16

icons_negative_international.png

ITS World Congress Singapore

Singapore

Singapore

start:

august 2019

completion:

september 2019

Siemens ITS Munich

Consulting and helping with solution design and creation of documentation for tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

  • support with installation and optimalization of devices

  • support with quotation for tender process

icons_negative_international.png

Tseung Kwan O – Lam Tin Tunnel

Hong Kong

China

start:

january 2018

completion:

march 2018

Siemens ITS Hong Kong

Consulting and solution design for highway and highway tunnels

  • consultancy in field of highway and tunnel information system technologies

  • designing the solution, creating the documentation with approval by the customer, presenting the solution to the customer in Hong Kong

  • creating the documentation for central control system testing as well as testing of individual subsystems

icons_negative_international.png

Liantang/Heung Yuen Wai Boundary Control Point Tunnel

Hong Kong

China

start:

october 2016

completion:

july 2017

Siemens ITS Hong Kong

Consulting in the tendering process

  • consultancy in the field of information system technologies and tunnel safety control

icons_negative_international.png

Qatar Education City Tunnel

Doha

Qatar

start:

july 2015

completion:

march 2016

Siemens ITS Munich

Conversion of SCADA system

  • conversion of the original SCADA system from PVSS (WinCC OA) into new Cimplicity 8.0 system

icons_negative_international.png

Sitina Tunnel

Bratislava

Slovakia

start:

july 2013

completion:

october 2013

Siemens ITS Munich

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system
  • support with document creation for the tender
icons_negative_international.png

Aberdeen Tunnel and Tate's Cairn Tunnel

Hong Kong

China

start:

july 2022

completion:

august 2022

Yunex Traffic Hong Kong

Consultation in the development of materials and technical solutions for the renewal of technologies for the R1 motorway

  • consultation of the interfaces of the individual subsystems
  • design of the Motorway control system components, the communication network and the connection of the equipment to the central system
  • support for the design and optimisation of the installation of equipment
  • support in the development of tender documents for the implementation of cyber security principles in accordance with Act 231/2022 Coll., ISO IEC 27002:2022 and NIS2 12/2022
icons_negative_international.png

R1 PR1BINA

Nitra

Slovakia

start:

november 2021

completion:

december 2023 (estimated)

Via Pribina a.s.

Programming TIMS (Traffic And Incident Management System) Gateway for Aberdeen and Cross Harbour Tunnels in Hong Kong

  • design and programming of SCADA system, which forms the interface between existing TCSS servers and server TIMS

  • programming a new SCADA system in WinCC OA 3.17

  • modification of existing SCADA systems in WinCC OA 3.06 and WinCC 5.1

icons_negative_international.png

TIMS System

Hong Kong

China

start:

march 2020

completion:

december 2020

Siemens Hong Kong

Creating a complete tender documentation for technical solution for Zheleznitsa Tunnel

  • basic documentation analysis, complete system design based on valid EU norms

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

icons_negative_international.png

Tunnel Zheleznitsa

Zheleznitsa

Bulgaria

start:

april 2020

completion:

may 2020

Siemens ITS Sofia

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, proposition of components for the tunnel control system, communication network and for connection of devices to the central system

  • support wih cabinets specification, calculation of individual components and with redundant power supply solution

  • specification of CCTV solution via Video OA app

  • specification of event management solution via our EMM module (Event Management Module), simultaneous integration in GIS at the WinCC OA platform

  • support with document creation for the tender

icons_negative_international.png

Central Kowloon Route

Hong Kong

China

start:

september 2019

completion:

february 2020

Siemens ITS Hong Kong

Consulting of the solution design in the tender process

  • interface consulting for individual subsystems, design of the network and device connection to the central system, support with document creation for the tender

icons_negative_international.png

Mina Tunnel

Abu Dabi

United Arab Emirates

start:

october 2018

completion:

december 2018

Siemens ITS Munich

Preparation of the ITCC/Conduct+ Demo project of Siemens Munich ITS for Intertraffic Exhibition, Amsterdam

  • creating Demo Project using virtual computers, which represent PLC system (using Step7 TIA Professional v14) and SCADA system (using WinCC OA 3.14) with integrated simulator

icons_negative_international.png

Siemens AG (Intertraffic Amsterdam)

Munich

Germany

start:

october 2017

completion:

march 2018

Siemens ITS Munich

Programming of modules for Central Control System of the highway tunnels

  • programming of modules EMM/GIS in WinCC OA 3.14

  • integration to the ITCC/Conduct+ system of the SIEMENS company

icons_negative_international.png

Liantang/Heung Yuen Wai Boundary Control Point Tunnel

Hong Kong

China

start:

march 2016

completion:

july 2017

Siemens ITS Hong Kong

Consulting in the tendering process

  • consultancy in the field of information system technologies and tunnel safety control

  • creation of binding documentation

icons_negative_international.png

Liantang/Heung Yuen Wai Boundary Control Point

Hong Kong

China

start:

september 2015

completion:

february 2016

Siemens ITS Hong Kong

bottom of page